24 Dec
Posted by admin as Chevrolet
Installation Instructions. Read Me! Rv. 01/04
1. DISCONNECT NEGATIVE (-) BATTERY CABLE.
2. Remove throttle body air intake system.
3. Remove (3) nuts & studs from the throttle body & manifold. (Ref. “C”)
4. Remove support bracket from engine block to throttle body. (Ref. “D”)
* Please Note: When removing support bracket bolt at engine block, loosen bolt enough to remove bracket. DO NOT REMOVE BOLT.
5. Install power plate using (3) 6mm x 55mm bolts and (3) 6mm flat washers. (Ref. “C”)
* Please Note: The engraved side of plate faces the throttle body.
6. Install furnished support bracket using existing bolts. (Ref. “D”)
7. Inspect & Test throttle linkage for full open & closed travel before driving. Some cruise or kickdown cables
may require adjustment. Please refer to your vehicles service manual for proper adjusting.
8. Reinstall air intake system using Step 2 as an example.
9. Reconnect battery cable. Enjoy!
The sound of power…The “whistle” means its working.
Parts List
(1) Power Plate
(2) “O” Rings
(3) 6mm x 55mm Bolts
(3) 6mm Flat Washers
(1) Support Bracket
Tools List
10mm Socket
5/32” Socket (stud removal)
8mm Socket (to remove bracket)
Related Tags: air intake system, bolt, bolts, Chevrolet, chevrolet impala, flat washers, grand prix 3, negative battery cable, pontiac, pontiac grand prix, power plate, rv, socket 5, step 2, stud removal, studs, system 3, throttle body spacer, throttle linkage, whistle
RSS feed for comments on this post · TrackBack URI
Leave a reply